Electrolux FAC124P1A Instrucciones de operaciones Pagina 121

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 140
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 120
Section 6 Sealed System
6-7
4. Remove leads from compressor motor terminals.
5. Remove mounting nuts and washers.
6. After refrigerant is completely recovered, cut suction
and discharge lines as close to compressor as
possible. Leave only enough tubing to pinch off and
seal defective compressor. Plug or tape any open
system tubing to avoid entrance of moisture and air
into system. Remove inoperable compressor and
transfer mounting parts to new compressor.
7. Release holding charge (release slowly to avoid oil
discharge) on new compressor to ensure there is
no leak in seam or tubing. Reinstall rubber plug.
8. Install new compressor in exact same manner as
original compressor.
9. Reform both suction and discharge lines to align with
new compressor. If they are too short, use
additional lengths of tubing. Joints should overlap
0.5” to provide sufficient area for good solder joints.
Clean and mark area where tubing should be cut.
Cut tubing with tubing cutter. Work quickly to avoid
letting moisture and air into system.
10. Solder all connections according to soldering
procedure.
11. Install filter-drier between condenser outlet and the
capillary tube connection.
12. Evacuate and charge system using recommended
procedure described under Evacuating and
Recharging.
13. Reconnect compressor terminal leads in accordance
with unit wiring diagram and reassemble unit.
DO NOT OPERATE RECIPROCATING
COMPRESSORS WHEN CHARGING LIQUID
REFRIGERANT INTO SYSTEM THROUGH ITS
PROCESS TUBE.
NOTE
If low-side process tube is too short, silver solder four
inch piece of tubing onto process tube at this time.
On R-22 systems, compressor must NOT be left
open to atmosphere for more than 10 minutes to
prevent moisture contamination of oil.
Installing a New Compressor
Replacement of the compressor must be done in a
continuous sequence so the system is exposed to the
atmosphere no longer than necessary.
All replacement compressors are shipped with rubber
plugs in the suction and discharge tubes and contain the
correct oil charge and a holding charge of inert gas.
Before installing the replacement compressor, remove
the discharge plug and check for the pop sound of the
inert gas leaving the compressor.
If the compressor checks OK, reinstall the plug. Do not
remove any of the plugs again until the compressor is in
position and you are ready to braze the lines.
A new compressor which is cold (e.g. after having been
kept in a cold service van) should be left to warm to
the surrounding temperature before the plugs on the
compressor connections are removed. This will help
prevent condensation from forming in the oil and the
compressor. Also, avoid opening the system when any
of the components or lines are cold.
A process tube is connected onto the high-side process
tube where the line splits into capillary tubes. The other
process tube is connected to the tubing prior to entering
the accumulator.
Follow the numbered sequence for all products:
1. Disconnect electrical supply to unit.
2. Remove all components necessary to access the
compressor assembly in the unit.
3. Attach an approved self tapping line tap valve to the
process tube. Connect refrigerant recovery system
to tap valve. Turn on recovery system, open the
line tap valve, and allow refrigerant to flow into an
approved tank.
DO NOT use compressor if you do not hear this
sound.
Vista de pagina 120
1 2 ... 116 117 118 119 120 121 122 123 124 125 126 ... 139 140

Comentarios a estos manuales

Sin comentarios